PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct hangers at the 2nd floor Facing North-East  (800x600).jpg Electrical conduit at the Electrical Room 284 Facing North (800x600).jpg Installed temporary lighting at the 3rd floor. Facing South-East (800x600).jpg Installing gas piping at the 1st floor Facing North (800x600).jpg Installing gas piping at the 1st floor Facing South-West (800x600).jpg Layout for the interior framing at the 3rd floor.(800x600).jpg
Previous pageNext page Electrical conduit at the Electrical Room 284 Facing North (800x600)
Electrical conduit at the Electrical Room 284 Facing North (800x600)